finished wall

finished wall
finished wall

cool pictures

cool pictures

 

 

Aerial photos provided by Boston Executive Helicopters

Ribbon Cutting June 5th 2024

Step #5 - 78 Sports Installing Turf

Step #5 - Distinctive Fences Installing 8' vinyl coated chain link fence

Step #4 - J. Hockman Excavating the area for Turf, installing gravel a base surrounded by a pressure treated border

Step #3 - Scituate Precast and J. Hockman Excavating set the panels on site

Step #2 - J. Hockman Excavating & Septic Services Excavated the foundation and installed a laser leveled stone base

Step #1 - Six Precast Concrete Wall panels poured by Scituate Precast

Proposal to Board of Selectman