finished wall
cool pictures
Aerial photos provided by Boston Executive Helicopters
Ribbon Cutting June 5th 2024
Step #5 - 78 Sports Installing Turf
Step #5 - Distinctive Fences Installing 8' vinyl coated chain link fence
Step #4 - J. Hockman Excavating the area for Turf, installing gravel a base surrounded by a pressure treated border
Step #3 - Scituate Precast and J. Hockman Excavating set the panels on site
Step #2 - J. Hockman Excavating & Septic Services Excavated the foundation and installed a laser leveled stone base
Step #1 - Six Precast Concrete Wall panels poured by Scituate Precast
Proposal to Board of Selectman